And sometimes I'm hardly working...Here are just a few action shots to prove demo and construction is happening. I still have the kitchen demo/construction post to share, but again...I'm working for a slave driver! (Did I mention I love cheesing for photos?)
Here I am showing off my TBT Hammer! My job for two days was to remove (or hammer in) nails from where the slats (that held the plaster) were nailed. Mind you, a slat is no more than 3 inches wide. So on each vertical 2x4" were two nails every three inches in a room that is 9 to 10 feet in height! Oh yeah, the ceiling beams had a ton of nails too.
Drilling holes for the electrical to go through! Yep, I drilled about 5 holes! And then the battery died!